Refrigerant Pressure Sensor Removal/Installation [Manual Air Conditioner]
Crank, BalancerPressure Sensor Removal/Installation [Two Step Deployment Control System]
1. Switch the ignition to off.
2. Disconnect the negative battery cable and wait for 1 min or more..
3. Remove the inner garnish..
4. Remove the front door trim..
5. Remove the bolts.
6. Remove the pressure sensor.
7. Disconnect the connector from the pressure sensor by pressing the ...
Hazard Warning Switch Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the center panel..
3. Remove in the order indicated in the table.
1
Screw
2
Hazard warning switch
4. Install in the reverse order of removal. ...
Joint Shaft Disassembly [Skyactiv G 2.0]
1. Disassemble in the order indicated in the table.
1
Snap ring
2
Joint shaft component
.
3
Dust seal
4
Bearing
5
Dust cover
6
...