1. Remove the plug hole plate in the order indicated in the figure.
NOTE:
Lift off and remove the plug hole plate from the installation areas as shown in the figure.

2. Install the plug hole plate in the reverse order of removal.
Non Return Valve Inspection [Skyactiv G 2.0]
Variable Swirl Shutter Valve Actuator Inspection [Mzr 2.3 Disi Turbo]Oil Control Valve (OCV) Removal/Installation [Mzr 2.3 Disi Turbo]
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove the charge air cooler..
4. Remove the ignition coils..
5. Disconnect the ventilation hose from the cylinder head cover..
6. Remove the cylinder head cover..
7. Remove in the order indicated in the table.
...
Variable Valve Timing Actuator Inspection [Mzr 2.3 Disi Turbo]
CAUTION:
Variable valve timing actuator cannot be disassembled because it is a precision
unit.
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove the charge air cooler..
4. Remove the ignition coils..
5. Disconnect the ventilation hose from th ...
Liftgate Latch Switch Inspection
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Liftgate upper trim.
b. Liftgate side trim.
c. Liftgate lower trim.
d. Liftgate latch and lock actuator.
3. Press the latch in using a flathead screwdriver to inspect the latch lever
condition.
4. Verify ...