Voltage Inspection
NOTE:
Because the BARO sensor is integrated in the PCM, replacing the BARO sensor includes replacement of the PCM.
1. Connect the M-MDS to the DLC–2.

2. Switch the ignition to ON.
3. Verify that the BARO sensor output voltage (PID: BARO) is within the specification..
If not as specified, replace the PCM..
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Two Step Deployment
Control System]
Clock Spring Inspection [Standard Deployment Control System]Restraints SST [Two Step Deployment Control System]
49 H066 002
Deployment tool
49 D066 002
Adapter harness
49 L066 002
Adapter harness
49 G066 003
Adapter harness
49 N088 0A0
Fuel and Therm ...
Brake Pedal Removal/Installation
CAUTION:
The clearance between the brake switch and the brake pedal is automatically
adjusted to the correct amount when the brake switch is inserted into the installation
hole on the brake pedal and rotated to fix in place. If the brake switch is
not properly installed, the clearan ...
DRL (Daytime Running Light) Bulb Removal/Installation
MZR 2.0, MZR 2.5, MZR 2.3 DISI Turbo
1. Disconnect the negative battery cable..
2. Disconnect the connector.
3. Rotate the DRL bulb in the direction of the arrow shown in the figure to remove
it.
4. Remove the DRL bulb.
5. Install in the reverse order of removal.
SKYACTIV-G 2.0
...