1. Disconnect the negative battery cable..
2. Remove the front mudguard.(RH).
3. Remove the front fog light relay case.
4. Remove the cover.
5. Remove the front fog light relay.
6. Install in the reverse order of removal..
Front Fog Light Relay Installation Note
1. Install the front fog light relay case to the shroud panel with the front fog light relay cover facing upward.
CAUTION:
If the front fog light relay case is installed to the shroud panel with the cover downward, water may penetrate the cover and the front fog light relay may not operate normally. Install the front fog light relay case with the cover facing upward.
Headlight Leveling Actuator Inspection
NOTE:
Headlight leveling actuator are integrated with the front combination light.
For the actuator inspection of the headlight auto leveling system, perform
the headlight leveling actuator operation inspection..
1. Measure the voltage at each terminal is as indicated in the ...
Door Adjustment
1. Loosen the door hinge installation bolts.
2. Adjust the gap and height difference to the standard range by moving the door
back and forth, left and right.
Standard range
a: 2.5―4.5 mm {0.10―0.17 in}
b: -1.0―1.0 mm {-0.039―0.039 in}
c: 2.5& ...
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Two Step Deployment
Control System]
WARNING:
A live (undeployed) air bag module or pre-tensioner seat belt may accidentally
operate (deploy) when it is disposed of and cause serious injury. Do not dispose
of a live (undeployed) air bag module and pre-tensioner seat belt. If the SSTs
(Deployment tool and Adapter harn ...