Accessories
Cruise Control Switch Inspection [Mzr 2.0, Mzr 2.5]Electric Variable Valve Timing Motor/Driver Removal/Installation [Skyactiv G
2.0]
WARNING:
A hot engine can cause severe burns. Turn off the engine and wait until it
is cool before servicing.
CAUTION:
Applying excessive force (force of 100 N {10.2 kgf, 22.5 lbf} or more) to
the electric variable valve timing motor/driver may cause a malfunction. When
...
Automatic Transaxle Shift Mechanism Removal/Installation
Selector Lever Removal/Installation
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove in the order indicated in the table.
4. Install in the reverse order of removal.
1
Upper panel
(See UPPER PANEL REMOVAL/INSTALLATION.)
...
Ignition Coil/Ion Sensor Removal/Installation [Skyactiv G 2.0]
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove the plug hole plate..
4. Remove the plug hole plate bracket..
5. Remove in the order indicated in the table.
6. Install in the reverse order of removal.
1
Connector
...