Drivetrain
Driveline/Axle SSTJoint Shaft Assembly [Mzr 2.5 (ATX)]
1. Assemble in the order indicated in the table.
1
Bracket
2
Bearing
.
3
Dust seal (RH)
.
4
Dust seal (LH)
.
5
Joint shaft
.
Bearing A ...
Fuel Injector Inspection [Mzr 2.0, Mzr 2.5]
Resistance Inspection
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Disconnect the fuel injector connector.
4. Inspect the resistance between fuel injector terminals A and B.
Fuel injector resistance
11.4—12.6 ohms [20 °C {68 °F}]
If ...
Washer Motor Inspection
1. Disconnect the negative battery cable..
2. Remove the front mudguard (RH)..
3. Disconnect the washer motor connector.
4. After connecting washer motor terminal A to the positive battery terminal,
and terminal B to the negative battery terminal, verify that washer fluid flows
to the wind ...