Voltage Inspection
NOTE:
The variable tumble shutter valve switch cannot be removed as a single unit. When replacing the variable tumble shutter valve switch, replace it together with the intake manifold as a single unit.
1. Connect the M-MDS to the DLC–2.
2. Switch the ignition to ON.
3. Verify that the variable tumble shutter valve switch output voltage (PID: IMRC_POS) is within the specification..
If not as specified, replace the intake manifold..
Engine Tune Up [Skyactiv G 2.0]
Engine Tune-up Preparation
NOTE:
If the accelerator pedal is depressed continuously for a specified time,
the engine speed may decrease to the idle speed. This is due to the fuel cut
control operation, which prevents overheating, and it does not indicate a malfunction.
The engine s ...
Engine Disassembly/Assembly [Mzr 2.0, Mzr 2.5]
1. Remove the engine from the transaxle..
2. Remove the generator..
3. Remove the exhaust system..
4. Remove the EGR valve..
5. Remove the intake-air system..
6. Remove the fuel injectors..
7. Remove the ignition coils..
8. Remove the crankshaft position (CKP) sensor..
9. Disassemble ...
Discharge Headlight Control Module Removal/Installation
CAUTION:
Incorrect servicing of the discharge headlights could result in electrical
shock. Before servicing the discharge headlights, always refer to the discharge
headlight service warnings..
1. Disconnect the negative battery cable..
2. Remove the front bumper..
3. Remove t ...