Overheating
Towing DescriptionFront Shock Absorber Disposal
1. Place the front shock absorber on a level surface or with the piston pointing
downwards.
2. Drill a 2—3 mm {0.08—0.11 in} hole at the point A shown in the figure
so that the gas can escape.
WARNING:
Whenever drilling into a shock absorber, wear protective eye wear. The gas
...
Power Steering Fluid Line Component Removal/Installation
NOTE:
The following procedure is for replacement of the parts shown in the figure.
Regarding replacement of the suction hose and return hose, refer to the electric
power steering oil pump component removal/installation..
Power Steering Pipe Component Removal/Installation
NOT ...
Joint Shaft Assembly [Skyactiv G 2.0]
1. Assemble in the order indicated in the table.
1
Dust cover
.
2
Bearing
.
3
Snap ring
4
Dust seal
.
5
Joint shaft
Dust Cover Assembly N ...