Voltage Inspection
NOTE:
Because the BARO sensor is integrated in the PCM, replacing the BARO sensor includes replacement of the PCM.
1. Connect the M-MDS to the DLC–2.

2. Switch the ignition to ON.
3. Verify that the BARO sensor output voltage (PID: BARO) is within the specification..
If not as specified, replace the PCM..
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Two Step Deployment
Control System]
Clock Spring Inspection [Standard Deployment Control System]Opening and Closing the Liftgate/
Trunk Lid
Opening the liftgate (5–door)
Using the electric liftgate opener
Unlock the doors and liftgate, then press
the electric liftgate opener on the liftgate
and raise it when the latch releases.
NOTE
(With the advanced keyless function)
A locked liftgate can also be opened
while the key ...
Front ABS Wheel Speed Sensor Removal/Installation
1. Remove in the order indicated in the table.
2. Install in the reverse order of removal.
3. After installation, verify that there is no twisting in the front ABS wheel-speed
sensor.
1
Connector
2
Front ABS wheel-speed sensor
...
Intake Manifold Vacuum Inspection [Mzr 2.0, Mzr 2.5]
1. Disconnect the evaporative hose (purge solenoid valve side) and install the
vacuum gauge..
2. Verify that the intake air hoses are installed securely.
3. Warm up the engine.
4. Measure the intake manifold vacuum while idling (no load) using the vacuum
gauge.
If not within the sp ...