Voltage Inspection
NOTE:
Because the BARO sensor is integrated in the PCM, replacing the BARO sensor includes replacement of the PCM.
1. Connect the M-MDS to the DLC–2.

2. Switch the ignition to ON.
3. Verify that the BARO sensor output voltage (PID: BARO) is within the specification..
If not as specified, replace the PCM..
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Two Step Deployment
Control System]
Clock Spring Inspection [Standard Deployment Control System]Fuel Pump Control Module Inspection [Skyactiv G 2.0]
1. Perform the KOEO self-test..
2. Verify that a fuel pump control module related DTC is detected..
If DTCs are detected, repair the malfunctioning part according to the applicable
DTC troubleshooting..
If a DTC is not detected, go to the next step.
3. Inspect the followin ...
Tweeter Inspection
1. Disconnect the negative battery cable..
2. Remove the inner garnish..
3. Remove the tweeter..
4. Verify the resistance between tweeter terminals.
If not within the specification, replace the tweeter.
Resistance
Without Bose®: 3.4—4.6 ohms
With Bose®: 3 ...
Rear Trailing Link Removal/Installation
CAUTION:
Performing the following procedures without first removing the ABS wheel-speed
sensor may possibly cause an open circuit in the wiring harness if it is pulled
by mistake. Before performing the following procedures, disconnect the ABS wheel-speed
sensor wiring harness connec ...