1. Verify that there is no torsion or cracks on the joint shaft.
If there is any malfunction, replace the joint shaft.
2. Turn the joint shaft by hand and verify that the bearing rotates smoothly.

If there is any malfunction, replace the joint shaft.
Joint Shaft Disassembly [Skyactiv G 2.0]
Joint Shaft Removal/Installation [Mzr 2.0, Mzr 2.3 Disi Turbo, Mzr 2.5]Electric Variable Valve Timing Motor/Driver Inspection [Skyactiv G 2.0]
WARNING:
A hot engine can cause severe burns. Turn off the engine and wait until it
is cool before servicing.
CAUTION:
Do not disassemble the electric variable valve timing motor/driver because
it is a precision unit.
1. Remove the battery cover..
2. Disconnect th ...
Side Turn Light Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the outer mirror glass..
3. Remove the outer mirror garnish..
4. Remove the screw.
5. Disconnect the connector.
6. Remove the side turn light while detaching tab.
CAUTION:
If the tabs of the side turn light are detached, th ...
Rear Tilt Motor Inspection
1. Remove the battery cover..
2. Disconnect the negative battery cable and wait 1 min or more..
3. Disconnect the rear tilt motor connector.
4. Apply battery positive voltage to the rear tilt motor terminals and inspect
the rear tilt motor operation
If not as specified, replace t ...