NOTE:
Perform the following inspection only when the transaxle has been overhauled.
1. Perform a road test and inspect the following items:
a. No abnormal noise in each shift position.
b. Smooth shift operation when shifting gears.
c. No gear slipout after shifting gears.
d. Back-up light switch operates correctly.
Inspection After Transaxle Installation [G35 M R]
Transaxle Fluid Temperature (Tft) Sensor Inspection [FS5 A EL]Starting a Flooded Engine
If the engine fails to start, it may be
flooded (excessive fuel in the engine).
Follow this procedure:
If the engine does not start within
five seconds on the first try, wait ten
seconds and try again.
Make sure the parking brake is on.
Depress the accelerator all the way and
hold ...
Starter Interlock Switch Inspection [Skyactiv G 2.0]
CAUTION:
Do not reuse the starter interlock switch if it is removed from the vehicle
even once. Replace with a new starter interlock switch when installing.
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Disconnect the starter interlock switch connec ...
Variable Valve Timing Actuator Removal/Installation [Mzr 2.0, Mzr 2.5]
NOTE:
Variable valve timing actuator can not be disassembled because it is a
precision unit.
Intake camshaft sprocket is integrated with the variable valve timing actuator
and cannot be disassembled.
1. Remove the battery cover..
2. Disconnect the negative battery cable ...