Hydraulic Variable Valve Timing Actuator Inspection [Skyactiv G 2.0]
Drive Belt Auto Tensioner Inspection [Mzr 2.0, Mzr 2.5]Neutral Switch Inspection [Mzr 2.0, Mzr 2.5]
Continuity Inspection
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Disconnect the neutral switch connector..
4. When the shift lever is in neutral and in a position other than neutral, verify
that the continuity between neutral switch terminals A and B is acco ...
ABS HU/CM Inspection
1. Disconnect the ABS HU/CM connector..
2. Connect the negative battery cable..
3. Attach the tester lead to the ABS HU/CM wiring harness-side connector and
inspect the voltage, continuity, or resistance according to the standard (reference
value) in the table below.
Standard (reference)
...
Tweeter Inspection
1. Disconnect the negative battery cable..
2. Remove the inner garnish..
3. Remove the tweeter..
4. Verify the resistance between tweeter terminals.
If not within the specification, replace the tweeter.
Resistance
Without Bose®: 3.4—4.6 ohms
With Bose ...