Battery Removal/Installation [Skyactiv G 2.0]
Front Fog Light Relay Removal/InstallationJoint Shaft Disassembly [Skyactiv G 2.0]
1. Disassemble in the order indicated in the table.
1
Snap ring
2
Joint shaft component
.
3
Dust seal
4
Bearing
5
Dust cover
6
...
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Standard Deployment
Control System]
WARNING:
A live (undeployed) air bag module or pre-tensioner seat belt may accidentally
operate (deploy) when it is disposed of and cause serious injury. Do not dispose
of a live (undeployed) air bag module and pre-tensioner seat belt. If the SSTs
(Deployment tool and Adapter harn ...
PID/Data Monitor Inspection [Two Step Deployment Control System]
1. Connect the M-MDS (IDS) to the DLC-2.
2. After the vehicle is identified, select the following items from the initialization
screen of the IDS.
a. Select “DataLogger”.
b. Select “Modules”.
c. Select “RCM”.
3. Select the applicable PID from the PID table.
4. Verify th ...