Quick Release Connector Removal/Installation [Mzr 2.0, Mzr 2.5]
Air Cleaner Element Inspection [Mzr 2.0, Mzr 2.5]PCM Removal/Installation [Mzr 2.0, Mzr 2.5]
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove the following items:.
Battery
PCM cover No.1
4. Disconnect the PCM connector..
5. Remove the battery tray and PCM component..
6. Remove in the order indicated in the table.
...
Schedule 2
Chart symbols:
I: Inspect: Inspect and clean, repair, adjust, fill up, or replace if
necessary.
R: Replace
L : Lubricate
C: Clean
T: Tighten
Remarks:
*1 Use of FL-22 is recommended when replacing engine coolant. Using engine
coolant other than FL-22 may
cause serious damage to the en ...
Variable Swirl Shutter Valve Switch Inspection [Mzr 2.3 Disi Turbo]
Voltage Inspection
NOTE:
The variable swirl shutter valve switch cannot be removed as a single unit.
When replacing the variable swirl shutter valve switch, replace it together
with the intake manifold as a single unit.
1. Switch the ignition to ON (Engine off).
2. Verify that ...